Intermodal wins on long lanes because the rail portion is priced per container rather than per mile driven. Beyond roughly 700 miles the savings compound — but the first and last mile are still truck moves with appointments, chassis and free-time rules attached.
The lane is a poor fit when the freight has to arrive on a specific morning, when the receiver cannot accept a 53-foot container, or when one end is not near a ramp. In those cases the drayage and the ramp cut-off time absorb the rail savings and add a handoff that can fail.
We quote the rail linehaul and both drayage legs separately so the modal split is visible. If truckload is the better answer for the service level you need, the numbers should show that too.