A container’s free days are counted from gate-out, not from the day it lands on the dock at its destination. If the delivery is delayed, the clock keeps running, and per-diem can exceed the dray itself within a week.
The discipline is to name the included free time on the quote, track the return date alongside the delivery schedule, and coordinate the empty return before the clock expires. Terminal appointments and chassis availability are the two failure points that most often push a return past free time.
We quote drayage per container with the free-time window named up front and the per-diem rate disclosed, then manage the appointment, delivery and empty return as one movement. Nobody should discover a demurrage claim on an invoice.