Resources / Detention, demurrage and per-diem: who sets the clock
Resource
Detention, demurrage and per-diem: who sets the clock
A detention or demurrage invoice is usually described as a rate problem. It is an execution problem: a clock started by a party that is not the shipper, and a set of steps the shipper does control. This guide separates the three charges, names who sets each clock, and shows how to keep a dispute documentary rather than conversational.
Last reviewed . The date moves only when the claims on this page are re-checked against the published rate and policy pages.
Three charges, three different clocks
Detention, demurrage and per-diem are often used as if they were one charge. They are three different clocks, assessed by different parties against different documents, and the first step in controlling any of them is knowing which one the invoice is describing.
| Charge | What it covers | Who assesses it |
|---|---|---|
| Detention | Carrier equipment or the driver held beyond the free time: a live load or unload that runs long, a trailer a receiver will not take, a truck waiting on paperwork. | The carrier that owns or controls the equipment, under the rate confirmation and its own tariff. |
| Demurrage | Cargo or a container sitting at a terminal, rail ramp, dock or transload beyond the free time, because the gate, the appointment or the entry conditions are not met. | The facility that holds the cargo: the terminal, rail ramp, dock or transload operator. |
| Per-diem | A daily charge for equipment after the free days: most commonly a container or chassis that has not been returned, or carrier equipment held past the agreed window. | The equipment owner or provider: the container or chassis owner, or the carrier, under its agreement. |
The invoice should name which clock it is charging. A demurrage charge is not a detention charge, and the party that assesses one is not usually the party that assesses the other. When the wording is loose, ask for the clock, the free window and the rate after it before you dispute the amount.
The published accessorial table on this site prices handling, not clocks. Detention, demurrage and per-diem are not accessorials and they are not in that table.
Who sets each clock
There is no national free-time number, because the clock on your load is set by a contract, a tariff or an appointment system, and those are three different documents.
- Carrier detention: the rate confirmation and the carrier agreement state the free window and the rate after it. On a live load or unload, the in and out times are what start and stop the clock.
- Terminal demurrage: the terminal or rail facility sets the free days in its tariff and controls the gate and appointment system that decides when the box can leave.
- Equipment per-diem: the container or chassis owner sets the free days and the daily rate, and the equipment control desk assigns the return point. The last free day is the date on that clock.
- Contract terms: when a forwarder, broker or third party sits between you and the carrier, the contract can move who answers for a clock without changing which party assesses it.
- Appointment systems: a missed slot can start or extend a clock even when the freight itself is ready. The appointment confirmation is the evidence of what was offered and when.
Each of those parties publishes different terms for different equipment, locations and commodities. That is why a single number repeated on a website would be wrong for most of the loads it claimed to cover.
Why this site does not print the day counts
A free-time figure is only true for the contract it comes from. The terminal named on your arrival notice sets the free clock for a container; the carrier’s rate confirmation sets the detention window for a live load; the equipment owner’s agreement sets per-diem. Those terms differ by port, by rail ramp, by carrier, by equipment and by contract, and they change.
So the site states who controls the clock and points to the document that carries the terms, instead of publishing a day count that could be wrong for the load. The port pages say the same thing for drayage: the terminal decides the appointment, the free clock and the demurrage charge. The rate confirmation is the contract: the free window and the rate after it belong on it, or the terms are not agreed.
Where the clock is set is covered on the port pages, which explain the terminal clock and the last free day, and on the drayage service page, which covers the container move itself. The rate basis page publishes the estimate formula and the handling table, and it deliberately does not price a clock.
If a document you are given quotes a free window, read which party issued it and which move it applies to. A terminal’s free-days term and a carrier’s detention window are two different agreements.
What the shipper controls, and how to document a dispute
The shipper does not set the clock, but it controls most of what starts and stops it.
- Appointment discipline: book the window the receiver or terminal requires, and confirm it in writing before the driver is dispatched.
- Paperwork: the BOL, pickup number, delivery receipt and appointment confirmation are the timestamps the invoice will be tested against.
- Dock readiness: a dock, a forklift, space and someone to sign decide whether a live load runs into detention.
- Chassis and empty return: confirm the chassis order, the return point and the last free day before the dray, not after the box is empty.
- Change control: when a window moves, put the request and the approval in writing so the clock change is attributable.
When a charge does arrive, a dispute is a documentation exercise rather than a conversation.
- The rate confirmation or contract page that states the free window and the rate after it.
- The appointment confirmation, gate receipt or terminal interchange record, with times.
- The signed BOL or delivery receipt showing in and out times, plus the pickup or delivery receipts at each end.
- Photos, gate or yard records, and the email thread showing when the delay was first raised and who controlled the step.
- The invoice itself, with the clock, the period charged and the rate identified.
Send the file in writing to the party that issued the invoice and copy the desk. The party that assesses the charge decides whether it adjusts, and no page on this site can promise an outcome. What the claims process looks like for cargo loss or damage is on the claims page.
Document the clock before the charge exists: in and out times, the appointment, and the reason for any change. A charge is much harder to dispute after the records are gone.
Questions
What is the difference between detention and demurrage?
Detention is the charge for holding the carrier equipment or driver beyond the free time, and the carrier assesses it. Demurrage is the charge for cargo or a container sitting at a terminal, rail ramp or dock beyond the free time, and the facility holding it assesses it. Per-diem is the daily equipment charge that runs after the free days, usually on a container or chassis.
How many free days or hours do I get?
There is no single number. The free window and the rate after it are set by the carrier, the terminal or the equipment owner for your contract and move, so they are stated on the rate confirmation or the facility tariff. Ask for them in writing before pickup rather than relying on a general figure.
Who pays a detention charge when the receiver keeps the driver waiting?
The invoice is commonly addressed to the party that arranged the freight, but who ultimately bears it depends on your contract and on which party controlled the delay. The in and out times, the appointment confirmation and the delivery receipt are what show where the wait happened.
Can I dispute a detention or demurrage charge?
Yes, and a dispute is a documentation exercise: the appointment confirmation, gate receipt, signed delivery receipt with times, and the email thread showing when the delay was raised. Send it in writing to the party that issued the invoice and copy the desk. That party decides whether to adjust the charge, and we do not promise an outcome.
Related
Ask the desk
Mon–Fri 8:00am–6:00pm ET. Questions about a lane or a document are answered in writing.
(502) 385-3399 Get an instant quoteArranging entity
Freight arrangements are made through Dynamic Distribution Solutions LLC dba Portlandia Logistics. Authority status →
Price the dray with the clock in view
The estimate prices the move. The free window and the rate after it are stated on the rate confirmation for the specific carrier, terminal or equipment, so ask for both in writing before dispatch.