Home / Ports / Seattle / Tacoma
Port drayage
Port Drayage for Containers Moving Through Seattle and Tacoma
Seattle and Tacoma operate as one container market under the Northwest Seaport Alliance, with terminals on two harbors sixty-odd road miles apart and rail ramps inside both. We quote the dray after release: the move to a Puget Sound receiver or DC, the rail ramp leg, the transload, and the empty return against the last free day.
Last reviewed - Portlandia Logistics dispatch
What we quote at Seattle / Tacoma
The complex spans the Seattle harbor terminals and the Tacoma tideflats terminals, and both harbors have rail inside them. The terminal named on your arrival notice decides the appointment, the chassis rule and the free clock, and it is the terminal we quote against. Because the two harbors are separate drives, the empty return point is confirmed before dispatch.
Our published lane directory prices from Seattle, WA and Tacoma, WA as an origin hub, so the linehaul side of a move here has a published basis. The dray itself is quoted per container against the terminal you name.
- Import containers after release: the container is available, the terminal appointment is booked, the chassis is confirmed and the dray runs to the receiver or the transload.
- Export containers to the carrier cut-off: pickup at the shipper, delivery to the terminal before cut-off, and the empty or export equipment position confirmed with your forwarder.
- Port to warehouse and port to door: the dray plus the linehaul where the receiver is outside the local market, with liftgate, appointment or inside delivery from the published table.
- Rail ramp drayage: the port-to-ramp or ramp-to-door leg quoted as its own move, with the ramp appointment and the interchange owned by the rail facility.
Container types and what each one changes about the dray
The Puget Sound is served by I-5 and I-90, and the receiving base runs from the Kent, Auburn and Sumner distribution parks to the Seattle and Tacoma industrial sites, with equipment, components and consumer freight behind most containers. Cascade pass closures and winter rain affect the linehaul side, and the dray itself is an appointment problem.
- 20-foot standard: Dense freight, and the lightest chassis position. Weight distribution and the axle load matter more than the cube, so an overweight box is a permit question, not a bigger-truck question.
- 40-foot standard: The default volume box and the one most receivers are built to unload. The dray is still quoted against the terminal and the receiving window, not against the box number.
- 40-foot high-cube: Same footprint as a 40-foot standard and taller cargo. Worth confirming overhead clearance at the receiving dock before the appointment is booked, because a high-cube at a low door is a delivery problem, not a road problem.
- 45-foot high-cube: A longer footprint that some yards and some receivers cannot take. Confirm the site can accept it before the appointment exists; the dray does not fix a yard that cannot turn the box.
- 40-foot reefer: Needs a genset when it sits at a yard or a door without a plug, and a pre-cool decision before the dray rather than at the receiver. The genset and the temperature record are supplied by the carrier and the facility, not by us.
- Flat rack and open top: Out-of-gauge cargo. That is drayage only while it fits a chassis; anything beyond legal dimensions is heavy-haul scope, quoted per move from dimensions after a route survey rather than from a drayage rate.
Free time, demurrage and detention in plain terms
Free time is the window the carrier and the terminal allow before equipment starts costing money. It is set by them, not by us, and it appears on your arrival notice or booking terms rather than in our quote. We do not print a day count on this page because it varies by terminal, carrier and equipment type, and a number that looked right on one move would be wrong on the next one.
Demurrage is charged when a container sits inside the terminal past free time. Detention is charged when a container sits outside the terminal - at your dock, at a transload, at a yard - past free time. Per-diem is a separate daily equipment charge in some markets. Three different clocks, three different parties billing, and one shipper paying if nobody tracks the return.
We track the last free day against the delivery and the empty return, and we raise it on the rate confirmation so the clock is visible before the dray. What we cannot do is waive a charge the terminal or the carrier has assessed, or promise a free day the carrier has not granted.
The accessorials a port move attracts
Chassis, pre-pull, storage, exam and overweight are real costs on a port move, and none of them is priced from this site, because none of them is ours to set. The honest version is that they are billed by the party that performs or assesses them, and we pass the document through rather than invent a number for it.
- Chassis: The chassis comes from the terminal chassis pool or the carrier arrangement, and the daily chassis fee is billed by the provider, not by us. We confirm the chassis arrangement for the size and weight before the dray runs.
- Pre-pull: A pre-pull takes the container out of the terminal ahead of the delivery appointment. It starts the equipment clock earlier and it costs money, so we only do it when you ask for it and we state the reason on the rate confirmation.
- Storage: Yard or terminal storage after free time is billed by the facility that holds the box. A transload that runs past its window can create storage at the transload as well, and that bill is the facility's, passed through with the document.
- Exam and hold: A customs exam, a terminal hold, a carrier hold or a security hold is not a scheduling problem we can solve. The exam fee, the exam move and the storage that accrues belong to the terminal or the agency that ordered it, and we do not influence the hold.
- Overweight: An overweight container needs a permit and often a chassis or axle configuration with more capacity. The permit is quoted per move from the weight and the route and is named as a line item, never folded into a drayage rate.
| Published handling charge | Amount |
|---|---|
| Liftgate at pickup / delivery | $95 |
| Residential or limited access | $110 |
| Appointment window | $45 |
| Inside delivery | $65 |
| Hazmat handling | $150 |
| Temperature controlled | $125 |
| Flatbed / rigging | $175 |
Only the handling rows above carry a published amount, and they are read from the same table as every other page. Chassis, pre-pull, storage, exam and overweight are third-party pass-through charges and carry no published amount on this site.
What is not included in a port drayage quote
- Ocean freight and the carriage contract: booked and sold by the forwarder or NVOCC the shipper appoints, not by us.
- Terminal handling charges, port fees, gate fees, yard fees, security fees and any fee the terminal assesses against the container.
- Customs entry, classification, duty, tax, bond and ISF filing: your customs broker and your importer of record own those.
- Chassis rental, chassis per-diem, storage, exam charges, demurrage and detention: each billed by the party that assesses it.
- Any accessorial the terminal or carrier applies that is not on the published handling table, until it is quoted and agreed in writing.
What we need before we can quote the dray
- The container number, the terminal named on the arrival notice or booking, and the equipment type and size.
- The release status: released and available, awaiting entry, or on hold. We quote the dray, not the release, and we cannot move a held container.
- The last free day on the terminal clock, and the empty return point the carrier's equipment control has assigned.
- The receiving address and window, and whether the site is a dock, a liftgate stop or a limited-access address.
- The container weight and declared value, so the chassis and the cargo certificate can be checked before dispatch rather than after a loss.
- For an export: the carrier's terminal cut-off, the booking or bill of lading number as issued by your forwarder, and who is declaring the VGM.
Questions
Do Seattle and Tacoma count as one drayage market?
They are one container market under the alliance but two harbors and two drives. A container does not move between them for free, so we quote against the terminal on the arrival notice and we confirm the empty return point, which may be at the other harbor.
Can you handle a rail ramp move out of this complex?
We quote the dray to the rail facility named on your booking as its own move. The rail facility and the railroad own the ramp appointment and the interchange, and we will tell you which party controls that timing rather than imply we do.
What is different about an export cut-off here?
An export is a cut-off problem: the container has to reach the terminal before the carrier's cut-off, and the export declaration and the VGM are the exporter's and the forwarder's work. We do not file either, and a truck that arrives after cut-off is a rolled booking rather than a drayage delay.
What does a Seattle or Tacoma drayage quote not include?
It does not include ocean freight, terminal handling, port or terminal fees, customs entry, duty, tax, bond, ISF, exams, chassis, demurrage or detention. Those are the carrier's, the terminal's, your forwarder's or your customs broker's charges, and they are never inside a Portlandia number.
Talk to dispatch
Mon–Fri 8:00am–6:00pm ET
After hours, email the terminal, the container number and the pickup window. The on-call dispatcher replies for loads already in transit; a new dray is quoted the next business day.
Call (502) 385-3399 Email the deskScope in one line
Port drayage is a US domestic truck move. Portlandia Logistics arranges the dray, the chassis arrangement, the linehaul and the delivery; we are not an NVOCC or a freight forwarder, we hold no FMC forwarder authority, we are not a customs broker and we do not file ISF or customs entries. We hold no terminal contract, berth, container yard, chassis pool or local office at any port, and the terminal and the carrier set the appointment, the free clock and the demurrage charge.
Naming a port or a terminal is a statement about where we quote, not a claim of a terminal contract.
Send the terminal, the container and the last free day
We will price the dray, the linehaul and the handling as separate lines and tell you which harbor and which charges each one belongs to.