Home / Case studies / Liftgate LTL program for a solar distributor

Case-study shell · LTL with liftgate and appointment windows

Liftgate LTL program for a solar distributor

A regional solar distributor shipping 2–4 pallets per order to job sites without docks.

Quote this lane typeAll case studies
This page is a shell — pending real loads.
Every result field below is marked PENDING. Nothing on this page is a claim about a shipment that has happened.

The problem

Job-site deliveries need a liftgate and a call-ahead appointment, and reclass disputes appear when module density is estimated rather than measured. The shell exists to document how the class check, the appointment handling and the delivery evidence were managed on real loads.

The approach

  • Verify freight class from measured dimensions and actual weight before the first tender.
  • Quote liftgate and appointment handling as named accessorials on the rate confirmation, not as post-delivery charges.
  • Track each delivery to a signed POD and keep the appointment confirmation with the load record.

Results

Pending PENDING — no completed loads have been released for publication. No metrics, savings, volumes or quotes are published here.

Evidence standard

PENDING — will include the load IDs, rate confirmations, POD and delivery dates for the loads the shipper approves for publication.

Lane type

Louisville, KY → Atlanta, GA · LTL with liftgate and appointment windows

Quote a similar lane

What will be published

  • Load IDs and dates
  • Rate confirmation scope and handling
  • Proof of delivery
  • Measured outcome — not a rounded marketing number

Have a load like this?

Send the lane and handling and the quote will show the planning range and its basis.

Price the lane you actually have

The estimate shows mileage, transit time and the basis before you submit. Dispatch confirms the firm rate.

Get an instant quote